Residential

Prefabricated Light Steel Framing and Prefab Panels save time

The reality behind Interbuild Limited’s pre-fabricated lightweight c

Interbuild’s pre-fabricated steel wall panels, together with a faster construction time make these materials a no-brainer – a cost-effective alternative to traditional building. That is why Habita...

UltraBond Floor System speeds up Apartment Building Construction

A composite floor system shortened construction time by three months a

Once assembled into floor decking and with rebar placed in the deep V-grooves, concrete is poured on the Ultra-Bond, creating a lightweight composite floor 292mm (11.5”) thick. Once finished, it has...